image gallery - building the music room

the music room building project was undertaken in 2007 from March to November (about 9 months) and was a very complex project overall.

In addition to the actual music room, we needed to construct a multi-level deck area to cover a wide and deep cut-out section between the levels of the house and also shift major sewerage and ducted heating services, including the hot water system, the ducted heating system itself and return air facilities. Building was also complicated by the need to keep as much head space as possible under the kitchen area which meant creating bearers at stump level in some places. The floor system for the room itself was created directly on the ground using highest level in-ground treated timbers. The wall frames were built within the existing house stumps and below the house floor system and carry no load themselves. The room is also heated and cooled.

There are 138 images in this album.

Press the Play button for an automatic slide show or click on any image or change to another page.

Choose other galleries from the galleries page. If you have any comments or questions please ask. Enjoy :)

candid comments

The images and information on this site are personal and privately owned. It is provided as a means to share with friends and other interested parties for viewing online, on this web site only. Other than documents and images specifically designated as 'public domain', the reproduction by any means and use by anyone for any means whatsoever other than direct viewing through this site is prohibited except by express written permission of the direct family of David, Hua, George and Sasha Mutch. Copyright © 2008-2014.

updated by David on Monday, November 30, 2009

33 pages